So made some actual progress the last couple weeks, but sadly not as much as I would have liked. I had wanted to have it assembled and painted by last Wednesday so that it could be transported, but all that got finished was the cutting and a small bit of the bottom assembly. The cutting went pretty good, only a couple pieces were cut incorrectly at first.  😉 There are few things I hadn’t planned for, but I think it should (hopefully) work out in the end.

Since I am back in Seattle however I no longer have access to these pieces and won’t be able to make it back down to finish work till mid-December. I am planning to take enough vacation to finish assembly and painting during this time, at which point I will just need to get it moved.

Overall it is probably good that I did not attempt to get it all finished, as I had sort of neglected how I was going to paint it till late in the process. I want to get as smooth as a finish as I can, but don’t have access to a paint sprayer, so I have been reading up on the best way to do this using rollers. Despite taking a long time to dry, it sounds like oil based paints get the best results and that with MDF you need a couple good coats of primer, sanded in between, to develop a good base to paint on. I also read that a 30/70 ratio of glue to water is a good replacement for primer, but the use of water on MDF has me a little concerned.

Beyond figuring that out I guess it will just a little longer to wait. I have been planning this thing since last January, so I suppose an extra couple weeks will not kill me.  🙂

Bookmark the permalink.

Leave a Reply

This site uses Akismet to reduce spam. Learn how your comment data is processed.